Rolled turf installation and lawn seeding in Tallinn and Harjumaa
A green lawn in a few days, or a budget-friendly seeded lawn that matures in a couple of months.
Price
- Lawn restorationfrom €2.50/m²
The final price depends on the area, access and scope of work and is agreed before work starts. All prices

A dense, flat lawn is built in the soil layer before a single roll of turf is unrolled or seed is cast. If the ground underneath is bumpy, poorly compacted or covered with thin peat, even expensive rolled turf will sink under footsteps and dry out in patches. We install rolled turf and sow new seeded lawns in Tallinn and Harju County, handling everything from old sod removal and ground levelling to the first cut.
Rolled turf vs seeding
Both methods give a durable lawn when the base is built properly, depending on your schedule and budget:
- Rolled turf (siirdemuru) gives an instant, weed-free green carpet in 1 to 2 days. Grown for 14–18 months at the turf farm, it holds slopes against rain erosion immediately and takes normal family foot traffic in 2 to 3 weeks.
- Lawn seeding costs less per square metre and lets us tailor seed mixes for shaded pine plots or dry sunny yards, but takes 6 to 8 weeks to close into a thick sward and needs careful watering and weeding while establishing.
We compare seasonal timing for both in our guide on when to install rolled turf in Estonia.
12–15 cm screened mineral topsoil base and rolling
Under Tallinn's landscaping requirements, a lawn that gets walked on needs a 100–150 mm compacted mineral growing layer. We spread a 12–15 cm screened mineral topsoil base (0–20 mm fraction, free of stones and roots), supplied via our topsoil, sand and crushed stone delivery service. We grade a 1–2% drainage fall away from buildings, screed the surface with long levelling laths, cross-roll it with a heavy lawn roller until footsteps barely mark the soil, and rake in starter fertiliser before laying or sowing.
Staggered turf laying, first 14 days watering and first cut
Fresh turf rolls are laid on the day of delivery in a staggered brickwork pattern so end joints never line up. We butt seams tight without stretching or overlapping, trim edges cleanly along beds and kerbs, and roll the laid turf so roots press firmly against the moist soil without air pockets.
During the first 14 days, watering decides success: soak the new turf right after laying with 15–20 L/m² so water reaches through the sod into the topsoil below, and water daily (twice daily in hot weather) until the roots hold fast when a corner is tugged. The first cut is done once grass reaches 5–6 cm, using a sharp mower blade on its highest setting (4–5 cm). Ongoing mowing is covered under lawn mowing and care.
Lawn installation price
Pricing depends on the area, old sod stripping, cubic metres of screened topsoil, gate access and whether you choose rolled turf or seeding. We measure the plot free of charge and agree a written quote beforehand (`price negotiable`). Send your approximate lawn size via our contact form.
Common questions
How soon can we walk on newly laid rolled turf?
Light walking to move sprinklers is fine right away, everyday family use can start after 2 to 3 weeks once roots anchor into the topsoil, and heavy ball games or dogs should wait 4 weeks.
What months can rolled turf be laid in Estonia?
From May through October; spring and September are the easiest periods because cooler temperatures and rain cut down the daily watering workload compared with July heat.
How thick a layer of screened topsoil goes under a new lawn?
We build a compacted 12–15 cm layer of screened mineral topsoil (0–20 mm fraction), adding roughly 20% extra loose volume before rolling so the finished lawn sits at the right height.
Why do the seams on self-laid rolled turf sometimes dry out and gap?
Gaps appear if rolls sit too long on the pallet, if edges are laid without staggered joints and rolling, or if watering during the first 14 days only wets the blades instead of soaking the soil underneath.
See our work
Photos from our own jobs, taken during the work and after it.



Our work

When is the best time to install rolled turf?
Rolled turf can be installed from spring to late autumn, but each season has its own rules. Here is when a new lawn roots fastest.
Read more